Mashhad metro line 3

General description of the project:

The length of Mashhad metro line 3 is about 28.5 km, which is the 1st phase of the construction project of line 3 of the holy Mashhad city train between Shahada station and the terminal. Considering that this line passes near the holy shrine of Imam Reza (a.s.) and special buildings. It seems that the sensitivity of the specific abina to rail vibrations is very important. Therefore, the use of vibration-absorbing carpets under the pavement track slab concrete bed has been predicted by respected consultants.

Scope of work:

  • Designing and preparing engineering reports related to railway vibrations
  • Performing SAT and FAT tests (seismography and vibration calculations before and after installing polyurethane carpets)
  • Production of 33,000 square meters of pu vibration absorbing carpet
  • Monitor the installation process

Employer:

Mahdsazeh Petro-Omran Company