Shiraz metro line 2 project

General description of the project:

The length of Shiraz Metro Line 2 is approximately 15 kilometers long with 13 stations. Metro Line 2 intersects with Shiraz Urban Train Lines 1, 4, and 6, and this line is mostly underground.
This line passes near historical and vibration-sensitive buildings, such as near Hafez Tomb and Saadi Tomb, and due to the importance of these buildings in terms of age and longevity, there is a need to reduce vibrations in this line.

Scope of work:

  • Production of vibration-absorbing carpets under concrete paving slabs in the amount of 32,000 square meters, including (27,200 square meters of carpet under the track slab with a thickness of 2 cm and a width of 260 cm, 4800 square meters of side carpet with a thickness of 1 cm and a width of 30 cm)
  • Warranty and after-sales service
  • Loading and packing
  • Quality control during production

Employer:

Shiraz Municipality Rail Transport Organization