Kermanshah Metro

General description of the project:

Considering the growth of the population of Kermanshah and its inclusion in the category of megacities, the need to build a subway and develop public transportation was approved. The length of the Kermanshah metro route is about 13 kilometers, this line passes through Khosro Parviz hunting ground near Taq Bostan in the north of Kermanshah city. Archaeological excavations in the area of ​​this hunting ground have shown that an ancient city related to the Parthian period is located in this area, whose walls were used for a hunting ground later in the Sassanid era. The passage of the city train through this location may cause irreparable damage to the historical buildings, so the respected contractors and consultants have designed the use of vibration absorbent carpets in this area.

Scope of work:

  • Preparation of engineering reports for simulating the performance of vibration absorbing carpets
  • Conduct laboratory tests
  • Production of 33,000 square meters of polyurethane vibration absorbing carpet

Employer:

Sabir International Company

Type of contract:

Engineering, supply and production, testing